Facebook Pixel
header-logo2.png Planning Alerts

Address

173 New Bond Street London W1S 4RF

Description

Temporary installation of illuminated festive decorations for a period between 10th of November 2021 to the 6th of January 2022 and temporary removal of the existing flag and flagpole. (Linked to 21/05509/LBC)

Dates

  • Received :

  • Tue 10th August 2021

  • Validated :

  • Wed 25th August 2021

Location Google Maps

* map location should not be relied on for accuracy

Documents 22 files

Published Document type View
25/08/2021Background Papers
18/08/2021Background Papers
17/08/2021ACKREC
10/08/2021Background Papers
10/08/2021Drawing
10/08/2021Background Papers
10/08/2021Background Papers
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Background Papers
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Drawing
10/08/2021Background Papers
10/08/2021Application Form

Construction leads delivered to your inbox

Receive contact details for future construction projects in your selected area.