2 Spring Mews London W1U 6AS
Replacement of existing two timber frame skylights with new timber frame skylights; replacement of existing metal railing and timber trellis with new stainless steel railing; and waterproofing of existing terrace area.
Received :
Fri 1st October 2021
Validated :
Tue 12th October 2021
Address | Validated |
---|---|
43 Chiltern Street London W1U 6LS | 23/04/2024 |
Flat 3 17 Thayer Street London W1U 3JX | 23/04/2024 |
99 Baker Street London W1U 6QQ | 02/11/2023 |
Basement And Ground Floor 102 Baker Street London W1U 6TL | 19/02/2024 |
Basement And Ground Floor 102 Baker Street London W1U 6TL | 24/01/2024 |
Receive contact details for future construction projects in your selected area.