Unit 9 Algernon Industrial Estate Shiremoor Tyne And Wear NE27 0NB
The existing felt covered flat roof will be stripped and replaced with a 3-layer bituminous felt system, and the existing glazed pitched roof will be replaced with a composite insulated panel system. The gable ends of the buildings will need to be raised b
Received :
Tue 9th January 2024
Validated :
Wed 10th January 2024
Receive contact details for future construction projects in your selected area.